-
North Link Final Civil and Architectural Design
Project Description
The project final design consisted of 5.29 miles of double-track Light Rail Transit (LRT) line and stations between the University of Washington interim terminal station and the Northgate Station, with approximately 20 cross-passages. The project included 16,340 feet of bored tunnels, two cut-and-cover stations, 1100 feet of retained cuts, a potential 600-foot cut-and-cover tunnel, 1100 feet of retained fill, 2200 feet of aerial guideway, and one elevated station at Northgate.
Project Details
Client:
McMillen Jacobs
Owner:
Sound Transit
JTS Role :
Contract Administration, Document Control and Diversity Management Services
Photography – Don Wilson – Sound Transit – Copyright © 2015
PROJECTS
Risk is best minimized through careful attention to document and project controls. And that’s where JTS comes in.
Jimale Technical Services L.L.C.
SEATTLE – (HQ)
505 3rd Avenue, Suite 200
Seattle, WA 98121
PHONE: 206.861.8000
PORTLAND OFFICE:
731 N Hayden Meadows Drive, Ste 101a
Portland, OR 97217