-
Sunset/Heathfield Pump Station
Project Description
The project design provides the ability and capacity to convey South Lake Sammamish Planning Basin flows currently handled by the Sunset and Heathfield Pump Stations to the South Treatment Plant. The South Lake Sammamish Planning Basin is made up of areas served by the Sammamish Plateau Water and Sewer District, the City of Issaquah, and the southeast portion of the City of Bellevue.
Project Details
Client:
Stantec Consulting Services, Inc.
Owner:
King County WTD
JTS Role:
Document Controls
PROJECTS
Risk is best minimized through careful attention to document and project controls. And that’s where JTS comes in.
Jimale Technical Services L.L.C.
SEATTLE – (HQ)
505 3rd Avenue, Suite 200
Seattle, WA 98121
PHONE: 206.861.8000
PORTLAND OFFICE:
731 N Hayden Meadows Drive, Ste 101a
Portland, OR 97217